Jobs

Work that has left here

Four jobs off the last year, with the tonnage and the lead time they actually ran to.

Steel beams under the roof of a fabrication shop

K-2418

Mezzanine and access stair

Food production unit, Runcorn

Beams, columns and a 26-tread stair with a landing, blasted and primed in the shop, erected over two weekend shifts so the line never stopped.

Tonnage
11.4 t
Lead time
18 working days
A steel roof frame under grey sky with two cranes behind it

K-2402

Plant deck for a chilled store

Cold store, Ellesmere Port

Galvanised deck, chequer plate and a bolted handrail. Everything drilled in the shop; nothing was cut on site.

Tonnage
6.1 t
Lead time
12 working days
A plasma head cutting parts out of a steel plate, the arc lighting the cut

K-2389

Ducting and transition pieces

Recycling plant, Widnes

Forty-two formed transitions in 3 mm sheet, each one a different developed pattern, profiled on the plasma and folded on the brake.

Tonnage
2.3 t
Lead time
9 working days
Folded metal cladding panels in a repeating diamond pattern

K-2377

Balustrade and cladding rails

Dock office refit, Liverpool

Folded steel cladding rails and a welded balustrade, finished in the fold pattern the architect drew rather than a stock section.

Tonnage
1.8 t
Lead time
10 working days

Yours next

Send the drawing, or the sketch you have. We will tell you what it weighs and what it costs.