BS EN 1090-1, EXC2
Factory production control certified for execution class EXC2, so structural steelwork leaves here CE marked and with a declaration of performance.
Qualifications
Certificates travel with the job. If your principal contractor wants the paperwork before the steel, ask and it comes first.
Factory production control certified for execution class EXC2, so structural steelwork leaves here CE marked and with a declaration of performance.
Every welder is coded to the processes and positions they actually work, and re-tested every two years. Certificates travel with the job.
Standard quality requirements for fusion welding, with welding procedure specifications held for each of the joint types we run.
One quality system covering drawing control, material traceability and inspection. Mill certificates are kept for ten years.
Assessed annually for health and safety, so we can be added to a principal contractor's supply chain without a fresh audit.
The erection squad holds CSCS and IPAF; two hold appointed-person and slinger tickets for lifts we run ourselves.
Procedures, cast numbers and inspection records for any job are kept here for ten years. Ask for the reference and we will send the file.
Say so on the enquiry and it comes back with the price.