Structural steelwork · Liverpool

Fabricated to the drawing

Structural steel, sheet and plate for contractors across the North West. Priced in 2 working days. Steel on site in 15 working days.

£58 / hour shop rate, minimum charge £145

A fabricator dressing a weld on a steel frame, sparks falling to the shop floor

The reason a fold lands where it should

The brake overbends

Steel is elastic before it is plastic. Stop the ram on the angle you want and the part opens as soon as the load comes off. So we take it 3.8° past the drawing and let it come back.

Cold formed, 20 °C

S275JR, 6 mm

A press brake forming 6 mm plate cold. The ram takes the bend to 86.2 degrees; when it lifts, the plate springs back 3.8 degrees to the finished angle of 90.0 degrees.
Drawing
90.0°
Ram takes it to
86.2°
Springback
3.8°
Ram travel
41.5 mm

Hot formed, 950 °C

S275JR, 6 mm, furnace at 950 °C

A press brake forming 6 mm plate at 950 °C. The ram stops on the finished angle of 90.0 degrees and the plate does not move when the ram lifts.
Drawing
90.0°
Ram takes it to
90.0°
Springback
0.0°
Ram travel
38.2 mm

Above about 900 °C there is no elastic recovery left to give back, so the punch angle is the finished angle. The right-hand press is the same drawing at 950 °C: scroll it and nothing moves when the ram lifts.

What leaves the shop

Four things, done properly, on our own floor.

  • Bundled galvanised steel sections stacked in a warehouse

    Structural steelwork

    Beams, columns, bracing and baseplates, fabricated to BS EN 1090-2 execution class EXC2.

    Up to 12 m single length, 5 tonne lift.

  • A press brake standing in a fabrication shop

    Sheet and plate

    Plasma profiling to 25 mm and press-brake forming to 3.2 m in one hit.

    160 tonne brake, 50 mm vee as standard.

  • A MIG arc striking on a steel joint, sparks lifting off the weld pool

    Welded fabrication

    MIG, TIG and MMA by welders coded to BS EN ISO 9606-1, re-tested every two years.

    Five bays, positional work to 6G.

  • A steel frame being erected, a beam hanging from a crane

    Site work

    Erection, remedial steel, handrail and access platforms, installed by our own squad.

    North West and North Wales.

Recent jobs

All jobs
  • Steel beams under the roof of a fabrication shop

    K-2418 · Food production unit, Runcorn

    Mezzanine and access stair

    Beams, columns and a 26-tread stair with a landing, blasted and primed in the shop, erected over two weekend shifts so the line never stopped.

    11.4 t · 18 working days

  • A steel roof frame under grey sky with two cranes behind it

    K-2402 · Cold store, Ellesmere Port

    Plant deck for a chilled store

    Galvanised deck, chequer plate and a bolted handrail. Everything drilled in the shop; nothing was cut on site.

    6.1 t · 12 working days

  • A plasma head cutting parts out of a steel plate, the arc lighting the cut

    K-2389 · Recycling plant, Widnes

    Ducting and transition pieces

    Forty-two formed transitions in 3 mm sheet, each one a different developed pattern, profiled on the plasma and folded on the brake.

    2.3 t · 9 working days

How a job runs

Six stages, 15 working days from an approved drawing to steel on your site.

  1. 01 Drawing You send a drawing, a sketch or a sample. We mark up what is unclear and price it.
  2. 02 Approval Fabrication drawings back to you for signature. Nothing is cut before that comes back.
  3. 03 Cut and form Profiled, sawn, drilled and folded. Every part carries its mark and its cast number.
  4. 04 Weld and inspect Welded to procedure, then checked against the drawing before it leaves the bay.
  5. 05 Finish Blasted and primed, or sent out for galvanising on a fixed three-day turn.
  6. 06 Deliver On our own wagon inside the North West, on a hiab where the site has no crane.

Send us a drawing

A sketch on the back of a delivery note is enough to start. Priced in 2 working days.