KANWICKSteelworks

Work

Recent jobs, with the numbers.

A few of the 186+ projects our clients have reviewed. Every one shipped on the date we gave when we priced it.

A dark steel frame of beams and bracing against a pale sky

K-2418 · Food production unit, Runcorn

Mezzanine and access stair

Beams, columns and a 26-tread stair with a landing, blasted and primed in the shop, erected over two weekend shifts so the production line never stopped.

Steel
11.4 t
Drawing to delivery
18 working days
A steel escape stair zig-zagging down the face of a building

K-2402 · Office refurbishment, Liverpool

External escape stair

Four flights and landings with bar-infill balustrade, galvanised then powder coated to RAL 7016, bolted on without a single site weld.

Steel
7.9 t
Drawing to delivery
16 working days
The gantry of a fibre laser over a cut steel sheet in a bright workshop

K-2389 · Recycling plant, Widnes

Laser-cut ducting transitions

Forty-two transitions in 3 mm sheet, each a different developed pattern, cut on the fibre laser and folded on the 160-tonne brake.

Steel
2.3 t
Drawing to delivery
9 working days
A slim black steel stair with a bar handrail against a concrete wall

K-2377 · Private house, Formby

Feature stair and balustrade

A folded-plate stair with a flat-bar handrail, cut and folded in-house, finished in fine-texture black and fixed to a concrete wall in one day.

Steel
1.8 t
Drawing to delivery
14 working days

Who we work for

Who orders from us?

Main and specialist contractors

Structural packages, mezzanines, plant decks and escape stairs, erected to programme with RAMS and paperwork in place before we arrive.

Architects and designers

Feature stairs, balustrade, screens and cladding details built to the drawn intent, with a sample for approval before the batch.

Manufacturers

Laser-cut, folded and coated components on call-off, from ten parts a month to a thousand, with stock held against your schedule.

From our clients

What buyers say after delivery

Main contractorsArchitectsFood productionRecycling plantsCold storageAgricultural machineryShopfittersHousebuilders

  • “We sent the steel package on a Tuesday and had a price with three sensible questions by Thursday. The mezzanine went up over two weekend shifts and the line never stopped.”

    Dan R.

    Contracts manager, Warrington

    Job K-2418 · Mezzanine and access stair

  • “They built the balustrade to the fold detail we actually drew, not the nearest stock section. Samples on the bench a week before anything was cut.”

    Priya S.

    Project architect, Liverpool

    Job K-2377 · Feature stair and balustrade

  • “Four hundred laser-cut brackets a month, folded and powder coated, and I have not had to chase a delivery in two years. That is the whole review.”

    Mark T.

    Production manager, Deeside

    Call-off account since 2023 · 400 parts a month